Started riveting the HS#2 rear spar. Decided to go up a
rivet size from the plans (like I did on the first HS) as the rivet callout is
short. The longer rivets are the correct length (AN470AD4-7 as opposed to 4-6) according to the rivet gauge
and are a bit more tough to set straight. It went extremely well and I did have
to drill out about 8 rivets total and reset them. Had a bit more tough time
setting the rivets for the hinge brackets, but in the end I'm very pleased with
how it turned out.
No comments:
Post a Comment