I need to get things ready to join the aft fuselage and the center section. One of the battles that I have is that my garage floor I’ve very uneven and sloped. So placing sawhorses directly on the concrete is not a great way to try to work on the fuselage if I want it straight. I've finally settled on building a semi-permanent platform (that’s level) to place the saw horses on.
Much of the time was spent on cleaning up the garage and getting area ready. I picked up twelve 8’ 2x4’s and went to work. I have the frame built and then levelled the assembly with the laser. All good to go. Just need to put some 3/4” ply down and paint it.