Sunday, May 29, 2022

Initial positioning of the Canopy slide Rail - 2 hours

 I want to mark out the positioning of the fuselage rivets on the C-762 Canopy slide rail. This will help ensure that I can properly locate the bolt mounting holes between the rivet holes. 


I began to mark and drill the bolt mounting holes to #40…..once I had them all drilled. I realized I made a mistake. The spacer and guide will need to move a bit back and forth to allow the canopy slider frame to sit in the right position. I should have waited to locate and drill the bolt holes once I have the spacer positioned correctly.