I needed to disassemble the aft fuse in order to start to devinyl the skins. But before I could reassemble I needed to ensure my sawhorses are level. My garage floor is fairly poor when it comes to how level things are. I built a frame on the floor to place the sawhorses on, and leveled that frame.
I then got to work de vinyling the aft fuse skins. A fairly long process but I assembled as I went.
I then started to look how to fit the F-710 bulkhead into the fuse.