I need to fabricate the two elevator pushrods. I cheat a bit with figuring out my rivet spacing by drafting what I need in AutoCAD. Drawing the diameter of the pushrods, then getting the circumference. That makes it really easy to print out a piece of paper with the needed rivet dimensions on it. That is then transcribed to the one end of each pushrod and I’m ready to drill.
Now comes the fun part. I want to make sure Van’s dimensions on the control rods are correct before I cut and drill the other end of the pushrods. The only way to do that is to install the rods and then take measurements. I managed to get everything installed and set up for the aft elevator pushrod. Looking good.
I’ll call it a night and start in when I’m fresh in the morning.