A bit of detailed work today to finish off the tunnel cover/fuel pump mount. With the pump in its final fit configuration, I need to drill the mounting holes into the tunnel cover. Getting this right took some time and some precise work.
Next all of the mounting holes needed to be drilled for the nutplates. And there is an amount of them. I also need to make a hole in the cover to allow the fuel pump wiring to rise up through the tunnel cover. This is basically guess work at this point to figure where the hole should be. A larger hole was made in the stiffener than the tunnel cover. I will eventually install a snap bushing.