Monday, August 17, 2015

Still working on the elevator counterweights - 2 hours



The replacement E-714 counterweight arrived in the mail. I set to work on drilling the new - proper holes in the counterweight. After transferring the hole location to the new counterweight, I set up the drill press similar to how I drilled the before. I then cleco'd the counterbalance skin on the E-703/704 spars and then used the #12 bit to drill the holes through the ribs. 

When I removed the counterweights, I noticed that one hole on the left side ribs was a tad too close to the inside radius. (I am a bit stumped how it happened as I used the exact same process I used before which yielded perfect results). Reading on the forums, it appears that this is a bit of a common issue but I will confirm with Vans via Email.