Tuesday, April 26, 2016

Preparing the Left leading edge - 2.5 hours

Not much in the way of pictures. I match drilled the left leading edge assembly and removed the ribs. I then deburred the skin. All I need to do is prep and prime mating surfaces but I want to have a little more time to start down that road.

So not wanting to dive into a whole load of work so late, I riveted on the K1100-08 nutplates to the splice plates. Always a good feeling to rivet! Means stuff is ready to go together.