Saturday, April 30, 2016

Prep'd the right leading edge - 4 hours

Now it was on to the right leading edge. The same boring prep work as before. Cleco, match drill, dis assemble, deburr everything, try to deburr the ribs, use the dremmel.

Cleaned up the nose rib tips as much as possible....long process with those. First go over segmented flange with a small round file, then a flat file, then smooth with a dremmel, then finish with maroon scotchbrite. I then dimpled the nose ribs.


It was such a beautiful day out, I threw in the towel and called it a day!

Friday, April 29, 2016

Riveted the left leading edge - 5 hours

I finally managed a good long day. Getting home early from work, I was ready to rivet the left leading edge. First order of business before riveting was to remove the primer from the stall warner bracket to allow a good ground for the wiring. The dremmel tool made easy work of it.

Then I began to cleco the leading edge assembly together. Never an easy task to get the nose ribs in and clecoe'd up as everything is a nice snug fit. Slow and easy is key, A tap here and a tap there. At one point I removed all the celco's and re-cleco'd

I started the first couple of rivets with the 4" no hole squeezer but I had a tough time getting rivets to squeeze nice and straight so I was drilling out a few rivets and re-setting them. I then switched over to the bucking bar. It's been quite a long time since I have bucked rivets so again...drilling out a few here and there. After about 20 rivets then I began to hit my stride. I did as much as I could, but found that I was having trouble setting the rivets in the nose as the curved surface was making it difficult to get the gun to stay in place. Not wanting to wreck anything I stopped and decided to wait for another day when I could have a bucking partner to help with setting the rivets.

Thursday, April 28, 2016

Priming Left leading edge ribs - Finished stall warn assembly - 3.5 hours

I managed to spend a good amount of time in the garage tonight. I had set up the washtubs to use the Chem-brite 218 that I had bought a few weeks ago. The process was simple. Scuff with scotchbrite, wipe with MEK, Bath in Chem-brite, rinse, wipe with MEK and Prime. Sounds like a lot of steps but it's very quick and the chem-brite acid does a great job.






Now that the ribs are drying, I moved onto finishing the W-432 joint plate nutplate riviting. All went extremely well and quick.

Then...I was back riveting the stall warner assembly.

Assembly of the stall warner is a little tricky. you really have to pay attention to the washer thicknesses. It matters and on the first round I didn't get it right. So a quick disassemble and reassemble and I was finished.

It works pretty slick.

Wednesday, April 27, 2016

More Preparing the Left leading edge - 3 hours

I had decided to change the order of process with priming. Do you prime and then dimple, or dimple then prime? Well with the 2 part epoxy that I had originally started out with, priming then dimpling worked just fine. But now that I have switched to self etching primer is another story. Seems that dimpling after priming has a tenancy to scuff the primer exposing the metal in some areas.

So from now on with the self etching primer I will prime after dimpling and see how that goes. I wasted no time setting up. I scuffed up the areas that I want to prime, then I started dimpling.
 
Once I was done the dimpling I went back over everything with more maroon scotchbrite to ensure good adhesion. A round of degreaser and remover, a round of MEK, then a coat of primer.

Once that was done, now came the tedious task of deburring the nose ribs. I found that it is a bit tricky to deburr some of the holes as some burrs are stubborn to get out, and access to the inside holes is not easy. A dremmel tool with the scotchbrite wheel is your friend in this case. I also filed and smoothed out the nose ribs really well. Lots of work, but worth it. I finished the rib prep by dimpling.



Tuesday, April 26, 2016

Preparing the Left leading edge - 2.5 hours

Not much in the way of pictures. I match drilled the left leading edge assembly and removed the ribs. I then deburred the skin. All I need to do is prep and prime mating surfaces but I want to have a little more time to start down that road.

So not wanting to dive into a whole load of work so late, I riveted on the K1100-08 nutplates to the splice plates. Always a good feeling to rivet! Means stuff is ready to go together.

Monday, April 25, 2016

Need a break from the fuel tanks, To the leading edge - 2 hours

Just need a break from the tanks. I just feel like I need to make bigger steps so I have decided to move over to the leading edge. I'll finish the stall warn device and leading edges and rivet them up. Just good to get on to something different.

I had picked up some aluma-brite 218 on the advice of another builder and I've been dying to give it a try, So after deburring, scuffing, and dimpling I set up and applied it to the stall warning assembly and the splice plates. It does a pretty good job. As soon as I wash it off it is apparent that it works. Water sticks well to the cleaned surface...very nice.

I then primed the pieces. I choose to use the 2-part epoxy as it stands up to abuse better than the self etching stuff, so I used it on these parts. (I will also use it on the leading edge nose)

Saturday, April 23, 2016

Fuel tank trap door - 2.5 hours

I managed to pick-up the proper hinge (MS20257-3) so I moved back onto the fuel tanks. Figuring out how to best set up the trap door took an amount of head scratching.  The trick is that you can't really follow the plans for the upper hinge as the depressed ring pattern on the rib prevents placing a rivet where needed. Looking at other build sites, one method employed is to leave the top hinge longer to bridge the gap. The next challenge is to layout the hinge so that there is good support of the hinge loops. In my opinion it is much better to have 2 loops per side.

Lots of sketching, checking, moving, re checking. It's not so straight forward.

This is the final version of the layout I chose

I then drilled to #40 and then countersunk the trap plate for a NAS oops rivet. My opinion is that the NAS rivet should be alright here as this is not a part that is subjected to stresses. However, since I only have two rivets to hold the top hinge I have decided to countersink the thicker hinge material for an AN426AD3 rivet.

Most important I thought in the process was to install a spacer under the top hinge the same thickness of the trap plate so that is sits flat against the rib.


Mental note.....MEK does not take off sharpie marker on hinge material!!! Nothing seems to.
I even tried buffing and sanding it off...GRRRR!