Saturday, December 26, 2015

Deburring and straightening wing ribs - 12 hours



Huge day on the plane, however not a whole lot of forward progress. I worked purely on deburring all the wings ribs and bending the flanges to 90 degrees.
First I broke all the edges and holes with files. Overall the ribs were in good shape but some had shear marks that needed to be taken out. So every rib  god a good once over with files. Then every nook and cranny had a once over with a file of some type.

Then a cleaned up all the edges (Except for the nooks and crannies) with the Scotchbrite wheel on the die grinder for the holes, and the bench grinder for all the other edges.

I then set up the straightener and dove in. I used a square to check 90deg instead of placing the rib against a 90deg surface as I found it was much easier to tell what was square, and what wasn't.


The wing ribs themselves are in pretty good shape, but all the leading edge ribs needed lot's of work.
Very labor intensive, and my hands are sore. But I'm crusing along!  

Thursday, December 24, 2015

Preparing to work on wing ribs - 7 hours



I managed to get a healthy amount of time in on the build, but unfortunately it was spent on building the home made tool to straighten ribs that everyone seems to use on the build logs. I ran and picked up more primer, a small torque wrench and a bunch of supplies at home depot to build the tool. It took about 5 hours in total to build the tool and clean up the saw dust.

I then started to write part numbers on the ribs and remove the stickers. Some stickers came off really well, but some required some good ol' fingernails and goof-off.



Wednesday, December 23, 2015

Completed the Rear Spars - 5.5 Hours



Finally off from work for the holidays, I intend to put some serious work into moving forward with the wings. The rear spars were ready to rivet, so off I went. I started with the fork doublers. I did the best I could to set the AN470 rivets. I find them a tad more tricky to set than AN426 rivets as it is difficult to get the squeezer straight on the rivet. I ended up drilling out and re-setting about 8 rivets in all. but overall I am satisfied with the work. I then completed the rest of the doublers. Pretty easy to do as there are not many rivets that get put in at this time.



It took me some time to rivet because I made extra sure not to set rivets in holes that are to be left open.

Tuesday, December 22, 2015

New tools arrived

Finally after waiting nearly two months my order from Avery Tools had arrived. Back in Nov 8th I placed a fairly big order since Avery Tools was going out of business. I ordered a tandem alligator squeezer, a pneumatic cleco gun, a larger selection of flat rivet dies in various thicknesses, SafeAir pitot mast and skyview plumbing kit. I was super excited that it was finally here.   

The cleco gun is nice, first impressions is that it will come in extremely handy for work on the skins. I gave the new squeezer a try. It has tons of power and a bit better trigger than my C frame squeezer. I can see that it will not be as easy to adjust the dies for setting rivets, and it will be a tad tricky to make sure that it sets rivets straight, but it sure is cool!

Monday, December 21, 2015

Primed the Rear Spar - 2.5hrs



Not much to report. I prep'd and primed all the rear spar parts.

Working on Mike's Stewart S-51

Mike came over this evening to work on his HS rear spar for his Stewart S-51. He had a look oever my work and I ran through some of my work. It was nice to get his eyes on my work to verify if I am doing things right.

Sunday, December 20, 2015

Prep'd the rear spars - 6 hours



Learning from previous experience, I match drilled the rear spar doublers to the rear spar with the drill press. progress was a bit slow, but it was precise.
 
I then transferred the aileron holes to the doublers. As per the instructions I used a unibit to remove as much material as I could. I then tried to use files to finish the holes but progress was extremely slow and I had much material to still remove. I dug out the dremmel with a small sanding drum which worked excellent. At first it removes a lot of material, but as the drum wears down so does its ability to remove material allowing you to easily fine tune the cuts.


As soon as I was close enough, I cleco'd the doublers to the rear spars and very carefully used the dremmel to match finish the holes.
I drilled and de-burred the parts.