Saturday, April 30, 2016

Prep'd the right leading edge - 4 hours

Now it was on to the right leading edge. The same boring prep work as before. Cleco, match drill, dis assemble, deburr everything, try to deburr the ribs, use the dremmel.

Cleaned up the nose rib tips as much as possible....long process with those. First go over segmented flange with a small round file, then a flat file, then smooth with a dremmel, then finish with maroon scotchbrite. I then dimpled the nose ribs.


It was such a beautiful day out, I threw in the towel and called it a day!

No comments:

Post a Comment