Saturday, August 7, 2021

Installing the static line and seat belt anchors - 3.5 hours

 One small item that I need to eventually complete is to finish the remaining 10 rivets in the forward gussets at the fire wall. I didn't get a chance to do them yesterday with Mike, and given the difficult accessibility of the area I'm reluctant to attempt bucking these solo. Its a pretty critical area. I will send an email off to Van's to see about the use of Cherry Max rivets for this.


Now that the aft top skin is on...I can crawl in the inside and install the seat belt anchors. To do this I laid towels down on all of the bulkheads an baggage area. Next I laid fence boards that I cut down to size across the baggage area, then laid full length boards down on the inside resting on each bulkhead. About 4 boards fanned out did the trick. Next I placed some foam on top of the boards and now I can comfortably craft back there.


Bolting the seat belt anchors is quick and easy.


 

Next, I started to install the static line. I really did not want to use zip ties as the plans suggest, so I used adel clamps instead. Much more professional looking and less chance for chafing in my opinion. Getting the static line around the seat belt anchor plate was fun.




 

Now I can install the seat belt anchor cables. Straight away I can see that the clevis does not set on the anchor plate well. 


 I will need to use 2 'L' washers in between the clevis and the plate. By adding and adjusting washers. The fit is now really good.




Thursday, February 11, 2021

Installing the Static ports and taking care of the to-do list - 2.5 hours

 Since I need to uncleco and remove the top skins to get at all the small outstanding items, now is a good time to install the static ports. I dug out the SafeAir1 kit that I've had for some time. I am choosing to bond the static ports with pro-seal rather than rivet. Seems like a lot of builders do this over riveting them.

Next, I located the 1/4" holes for the static ports somewhat close to the dimensions shown on the drawings (Detail #E/Drawing 28). I maintained the 2" dimension from the longeron, but I adjusted the dimension forward of the bulkhead rivet line from 11/16" to 1 1/8" as the Safeair1 ports are a much larger diameter than the standard Van's ports.

I de-vinyled the areas, scuffed the aluminum, cleaned with MEK. I mixed up some proseal and installed a thin layer on the static port. After installing the port and giving it a 1/4 turn twist, I clamped the ports to the assembly and wiped any excess that tried to ooze out. 




With the static ports taken care of, the next item that I need to get done was to install the lower baggage bulkhead nutplates and drill and install the one rivet on the top of the F-728C angle.


 






Sunday, October 30, 2016

Mounting the pitot heat controller - 3 hours

One of the ideas that I liked while researching other builds was mounting the heat controller in the bay beside the aileron bellcrank. I figure the best way to align things was to cut out a template and use that as a drill guide on the wing rib rather than try to work with the actual heat controller.


Once I was satisfied with the alignment and the position, I drilled holes for #6 screws. Next I had given some thought to how I wanted the controller to be mounted to the rib. Most have screws but are accessed from the inside. I figured if I installed nutplates on the controller, I could easily install/remove the controller by having screws accessible from the access plate. So that's the direction I headed.







Saturday, October 29, 2016

More Pitot work - 3 hours

More monkeying around with the pitot. Ive pulled in the lines and through the new bell crank bracket that I had made. At first it looks good, but then I see the top most line is awfully close to the bellcrank.



I may need to reroute that topmost line down a hole. The clearance is great if I did it that way. I also notice that the AN509-6R6 screws are just a bit too long for the pitot so I will revise these to AN509-6R5 screws (5/16" length)


I took the opportunity to prime the countersunk holes in the mast.

Looking good.

Friday, October 28, 2016

Drilling the Pitot Mast - 3 hours

I've been looking forward to drilling the pitot into the mast for some time now. I've looked at a number of installations and I think that I have wrapped my head around it enough to tackle the task.
Straight away I can finally see where everyone mentions the 'thick part' of the pitot. I will need to ensure that the pilot holes for the #40 drill bit will be centered on these. Easy enough to do if I drilled directly into the pitot. But the tricky part is that I need to drill through both the mast and the pitot so transferring the holes on the outside the mast will be tough given the curved surfaces and the thickness' involved. So I began to mark out all lines on the pitot with the idea that I will transfer them up to the mast.

When inserting the Dynon pitot into the Safe Air 1 mast the slip fit is a little loose. Enough to make me feel nervous about drilling it that way. So I used a piece of electrical tape wrapped around the pitot (1 layer). The fit was not snug but found 2 layers was too thick. So I used 1 layer of electrical tape and 1 layer of masking tape...nice and snug. 

Then I went to work transferring the lines up the mast. Also placing the holes dead centre between the 0.700" overlap between the mast and pitot.

I didn't not feel 100% comfortable that I had transferred the lines right. There is so many ways that errors could have crept in. So I made a paper template and marked out the lines on that and compared that with the markings on the pitot and the mast. Everything seems to be in order. It's still not the most precise way but at some point I just had to roll with it.

I set up the vice on the drill press and drilled the holes with #40 pilot hole. Once I was happy with that, I opened up the holes to #32. I then pulled it all apart and inspected. I am very pleased with the aft holes. Dead centre. The forward holes are a bit off centre (maybe 1/32") but still in the thick part of the pitot metal. But considering how narrow the forward most 'thick' parts are, I think I did just fine.


I completed tapping treads for #6 screws. Now I just need to countersink the mast. I'll do that tomorrow. Getting late tonight, and it's never good countersinking when tired.

Looking back on it I suppose I could have pulled out my pitot hole template. I could have slipped that over the pitot and marked the lines and used that to transfer to the mast. Who knows it may have worked better, may not. In the end I'm happy with the result. 


Saturday, October 15, 2016

Re-fabricating the Pitot guide and priming work - 7 hours

Managed a long day on the build. I needed to re-fabricate the guide to route the pitot lines under the bellcrank. The last one I made was nice, but the lines were just too close to the bellcrank. I'm not afraid to say that it took me six whole tries at remaking a bracket that I was happy with. Without going into too much detail, it took some head scratching to figure out how to build the bracket to get the holes close to the spar and still be strong, and have all the holes line up correct and straight.
Perseverance paid off.

The tubes will clear nicely.

Since It was a nice day outside...I decided to get a bunch of priming done on the aileron spars so I can forge forward with those. Since everything was out, I completed the priming on the aileron and flap braces.

Sunday, October 9, 2016

Pitot plubing lines guide - 3.5 hours

I began fabricating the guide that routes the pitot plumbing under the bellcrank. Similar to many who have used this method before me, I followed suit. I had used 0.025" material and bent a braket 90 degrees. Next I needed to properly locate the bolt holes from the spar to the bracket. A littel head scratching and I then tried a paper template. Pushing the bolts through the holes marched the perfect holes and then I could easily transfer them onto my bracket.


After drilling...The fit was perfect!

Turns out that I placed the holes too close to the bend....So I had to make another angle and start again....this time giving much more space to account for the bellcrank bracket. Then, a bit more work, a cut here and cut there....bit of checking, but of file work....bang! Done.

Cutting the wing skin and forming more brackets - 3 hours

Now all that needs to be done to finish the pitot mast rough-in is to cut the hole in the wing skin.
I used the handy aluminum template I had made yesterday and clecod it to the wing skin. I traced the outline of the pitot mast hole onto the skin, found the centerlines and made the initial holes with the unibit. I used the round files to work away at removing the excess material.

Once I was close to the line with the files, I broke out the dremel with sanding drums and went to work. Slowly but surely I made progress.
In the end, I am extremely pleased with the fit.



 
Now that the mast is done. I need to fabricate the bracket to hold/support the pitot and AOA lines around the bell crank.