Tuesday, September 21, 2021

The finish kit arrives! - 5 hours

 The call came today that the finish kit is being delivered. A very exciting day and I will be very busy this winter.




I started in on inventory and inspection. I was missing a few pieces. The main roll bar and 1 hardware bag is back ordered. 1 hardware bag was missing. The backordered parts hurt a bit, but given the issue surrounding covid it's totally understandable. 

One item that I notice while inspecting the engine mount, One of the mounting holes seems to be a bit to the side of the engine frame tube. 


All other mounting holes are looking good. I called Van's tech support since I didn't know if this was going to be an issue. Simply put...this is fine and is to be expected. When welding the engine mount the welding process makes the mount move with the uneven heating and contraction. These tubes are oversized to account for the potential movement. The pilot holes are drilled on a jig after welding so they are in the spot they need to be. I just need to open the holes eventually to AN6. Vans said, I might need to jog the hole over just a tad to ensure clearance of the AN6 bolt with the side of the tube. 



Sunday, September 19, 2021

Completed painting of the interior and removed masking tape - 5 hours

 Finally finished the interior paint. Then came the very long task of removing the all the masking tape. I'm quite happy on how to turned out.













Saturday, September 18, 2021

Finish prep and painted the interior cabin area - 10 hours

 Huge long day on the build today. I finished masking off the firewall area of the fuselage.


The cabin area is ready to paint. Before I did that, I wiped all of the interior down with Acetone and then did a final spray of epoxy primer. This allows for all exposed rivet heads to have a coat of primer


After a couple of hours the final 2K single stage paint is ready to spray. The air is calm and warm...its a perfect day to paint. 



 

Sunday, September 12, 2021

Starting prep for interior cabin paint - 4 hours

 One item that is high on the to-do list is to finish the painting of the interior cabin area. The temperatures are starting to fall as we approach fall,and I plan on painting outdoors. I need to get into it. 

For my particular build...I've help off final paint until after assembly. That means I need to mask off a lot of components. ...So much masking tape.








Saturday, September 11, 2021

Finished the remaining rivets in the F-705 bulkhead - 1 hour

 I noticed that I haven't installed the 3 remaining rivets in the F-705 bulkhead. It was a bit of a head shaking moment, simply because these rivets need to be dimpled and I hadn't done that yet. Mental note...dimple these 3 before you finish the forward top skin. 





Friday, September 10, 2021

Installing the rudder cables - 2.5 hours

 Before I dismantle the baggage floors and the temporary wood structure for the tail cone. I need to start getting the rudder cables installed in the aft section of the fuselage. I though this would be a bit more difficult than it is. The cables are simply installed through the fuselage from the rear. The only item that you need to pay attention to is that the plastic grommets need to be installed on the cable before you thread the cable through each bulkhead. The clevis takes a little bit of force to slip through the grommet, so doing this is easier when the grommet is not installed in the bulkhead.



I do not want to install the rudder cables through the forward cabin area until I've painted the cabin. So I managed to find a couple of linen bags at the dollar store. I could roll up the cables and slip them into the bags to protect them. I can then place them in the tail cone until the painting is done. 







Saturday, September 4, 2021

Finally finished the Forward Top Skin Riveting - 4 hours

Not the most fun trying to finish riveting the Forward Top Skin. Working solo, this is a bit more tricky than one would think. I managed to set all remaining rivets in the baggage bulkhead as well as set the F-6111 ribs. One really tough rivet to set was the rivet common with the F-6111 rib and the F-705 bulkhead. The area is extremely tight and getting a bucking bar in there is just brutal. I tried setting a AD3 rivet a few times, but it just wasn't setting correctly. In the end I just had to use an MK-319-BS rivet for those two locations.