Thursday, June 27, 2019
Began work on the F-623 corner ribs - 1.5 hours
Now that everything was match drilled, I flipped the assembly and began to figure out the F-623 corner ribs. I need to trim these as they need a little extra TLC being that there are shared from the older non-drilled/raw RV-6 parts. Of course I want to be careful and not trim to much, so I took a conservative approach. Check three times, and mark.



Wednesday, June 26, 2019
Match drilled the F-776 skin - 2 hours
Tuesday, June 25, 2019
Cleco'd the F-776 skin to the center section - 3 hours
I struggled to get the F-776 bottom skin onto the centre section. I tired a couple times to get it cleco'd working front to back, but the holes were just too off when transitioning aft of the F-705 bulkhead. I then disassembled and tried starting in the middle at F-705 but when I got to the F-704 center section assembly, the holes were again too off. I double checked my assembly, the F-916 spacers were in. 

The issue I seemed to be having is that the radius of the F-716 seat ribs is not tight enough and this is reflected in the fit of the ribs to the F-704 center section. The holes do not line up by themselves, however with some hand pressure they line up.

I need to figure a way of squeezing this up.
After some head scratching I thought of clecoing the top row and bottom row first...this will help evenly squeeze the assembly as I celco'd row by row to the middle. As I started, the middle of the skin was a bit proud off of the F-705 bulkhead as the tight skin wanted to bow the structure the opposite way.

After a few more rows of cleco's, holes were starting to line up very well. Still tight, but much better than they were. So I clecoed the middle rows.

And just like that, the skin went on. Whew!


The issue I seemed to be having is that the radius of the F-716 seat ribs is not tight enough and this is reflected in the fit of the ribs to the F-704 center section. The holes do not line up by themselves, however with some hand pressure they line up.
I need to figure a way of squeezing this up.
After some head scratching I thought of clecoing the top row and bottom row first...this will help evenly squeeze the assembly as I celco'd row by row to the middle. As I started, the middle of the skin was a bit proud off of the F-705 bulkhead as the tight skin wanted to bow the structure the opposite way.
After a few more rows of cleco's, holes were starting to line up very well. Still tight, but much better than they were. So I clecoed the middle rows.
And just like that, the skin went on. Whew!
Monday, June 24, 2019
Devinyled the F-776 centre section bottom skin - 2 hours
Sunday, June 23, 2019
Assembled/Cleco'd the center section frame - 1.5 hours
Monday, June 17, 2019
Sunday, June 16, 2019
Modified the F-716 ribs for the control access - 1.5 hours
Small day today on the build, I cut the two (2) F-716 ribs for the removable piece that allows installation of the stick controls. I used the band saw to make the cuts and then used the sanding station to clean things up. A final run through with the 3M wheel cleaned it all up.


Although a small build day, it was a heavy research day. First I needed to figure out how may F-716 seat ribs I wanted to modify to allow Stick control access. The plans indicate two, however many folks modify four. I finally settled on only doing 2 ribs...I can always easily modify the other 2 ribs at a later date if I hit a brick wall down the road.
As well, I decided very early on that I wanted to make removable baggage panels but had no idea what was involved. Yesterday I sent off an email to Van's just to get things on record for my build and to ask about #8 vs #6 screws if I did the removable baggage panels. But today I had to figure out process, configuration and counts. There is not a whole lot of information out there on how to do this but with enough research I see WireJock's RV7 page gives a good idea of what he's done. I will try to document my process a little better to answer all the questions I had. Basically I decided to follow wirejock's plan and use countersunk screws for everything aft (and including) the F-705 bulkhead. Everything forward of F-705 will be standard screws.
Although a small build day, it was a heavy research day. First I needed to figure out how may F-716 seat ribs I wanted to modify to allow Stick control access. The plans indicate two, however many folks modify four. I finally settled on only doing 2 ribs...I can always easily modify the other 2 ribs at a later date if I hit a brick wall down the road.
As well, I decided very early on that I wanted to make removable baggage panels but had no idea what was involved. Yesterday I sent off an email to Van's just to get things on record for my build and to ask about #8 vs #6 screws if I did the removable baggage panels. But today I had to figure out process, configuration and counts. There is not a whole lot of information out there on how to do this but with enough research I see WireJock's RV7 page gives a good idea of what he's done. I will try to document my process a little better to answer all the questions I had. Basically I decided to follow wirejock's plan and use countersunk screws for everything aft (and including) the F-705 bulkhead. Everything forward of F-705 will be standard screws.