Sunday, February 7, 2016

Finished the right wing W-423 joint plate - 3 hours



Again, not as big a day that I wanted to get done. but it was still good to reach the finish line with the leading edges. I fit up the W408 rib on the right wing leading edge and installed the W-423 joint plate. For some reason it felt as if this side was being more difficult than the left side. Although, I didn't have the stall warning hatch hole to work with. Again, the process for fitting was identical as the left side. I was sure to get a nice tight fit against the leading edge skin and I am also quite pleased with the alignment of the joint plate and rib. Once i was happy with the fit, I started match drilling and clecoing each hole as I went. Checking, adjusting, and checking again.


Once that was done the next move was to open up the hole for the right wing tie down. Just like the left I started with a round file and reworked center.

Then I used a unibit to open the hole. I had to stop and remove the leading edge so I could remove the plastic as it was difficult to tell how centered I was.
 

 I quickly refitted the assembly on the spar to check alignment  and it looked good. So I took it off and completed drilling with a unibit to 3/8". However when I put the assembly back on and started to cleco, I could tell that my alignment was a tad off. so I readjusted, used the circle template to find the proper correction. I decided that I was going to go up one step on the unibit to 7/16" to allow clearance for the bolt and the skins when painted. Fortunatly the 7/16" hole placed correctly will allow for my slightly off 3/8" hole. So i broke out the files and went to work re-centring the hole. Once it was good, I finished off both holes (left and right wing) with the 7/16" unitbit.

Friday, February 5, 2016

Match drilled the Right Wing W408 rib - 0.5 hours

I really wanted to do much more than match drilling the right wing W408 rib. But that's all that happened. At least it came out really nice.

Thursday, February 4, 2016

Tank Z-Brackets Research


Time to figure out how to do the z-brackets. Reading the construction logs, it can be a tad bit difficult to figure out what the best course of action is here. Everyone is on board with the Hurlbut method that Dan Checkoway had popularized. But I was unsure on where the center line was derived from. Was it the top of the flange or the bottom of the flange. Different build logs have center lines on either side. Great response to questions on Van's Airforce. The method and procedure started to fall into place.

Center lines are drawn on the bottom flange (The face that sits against the spar). From that point....The holes are offset to one side 1/16". The offset is towards the web for all the outboard flanges. This places the nutplace close to the web, and thus maximizes the clearance for the pop rivets that are later installed. For the most inboard z-bracket though. The offset is opposite and is 1/16" (away from the web). This places the AN3 bolt such that there is room for the socket head.

I'll give it my best shot and see how things turn out. Worst case is that I just need to re-order more z-brackets. 

Wednesday, February 3, 2016

More Tools



More goodies arrived when I came home from work. This time tools from Cleveland Tools. The little tungsten bucking bar should come in handy. I also really like the polished tie down bolts.
I also bought #30 and #40 reamers. I'll give those a shot.

No work on the project tonight though. Too tired.

Tuesday, February 2, 2016

Fitted right leading edge, Opened up the left tie down hole - 2.5 hours

Managed to cleco the right leading edge. This side seemed to be a bit more difficult to get the initial holes to line up. I ended up putting the first couple of clecos in the front, then swung the leading edge assembly around and put one cleco in the bottom side to suck the ribs nice and tight forward into the leading edge. Worked it slowly. Finally worked the clecos on the top side front to back, flipped it around to the bottom side, again front to back. I then placed it on the right wing. Very nice fit!!!



I took a short break...not sure if I really had the energy tonight to deal with the joint plate. So i decided to try to open up the left wing tie down hole. Again slow and easy was my approach. I worked exactly according to the plans and used a file to re-center the factory hole and open it up. Then I used a unibit. I was careful not to get the unibit too deep and cut into the tie-down bar.


At the end, I uncleco'd the leading edge to use the unibit on the final cut....just to scared that i will chew into the tie down bar. I'm pretty happy with how good it turned out. I think i'll open it up a tad more just so that there is some clearance for when paint is applied.

Monday, February 1, 2016

More Cleco's!!! Re-fitted Right wing skins- 1.5 hours

I arrived home from work to find that my shipment from Vans has arrived!!! I so badly need the 500-3/32" clecos to make progress. I also got 50' of conduit, 2 flop tubes, safety wire, locking fuel caps, blank plates for tanks, Proseal, polygone gel, tank test kit,


I was eager to see what the fuel caps looked like. I was not disappointed. Expensive - yes, but worth every penny!

So no time like the present to put the cleco's to use. I re-fitted the top skins on the right wing.



Sunday, January 31, 2016

Fitting Left leading edge w-408 rib - 4 hours

It was finally time to finish preping the W-408 leading edge ribs. I slid one rib into the leading edge assembly and marked the holes with pen to give me an idea of where to flute the ribs.

I then transferred those marks over to the other rib. It was not time to double check the flanges were 90 degrees. I broke out the rib straightener and made some adjustments.

I then fluted the ribs. The left one went well, but the right just gave me brain damage. Not the easiest to work out. I was satisfied that it was sorted out, but not a perfect as it could have been. In any case, I fit the left rib into the leading edge assembly and clamped the rib to allow match drilling the aft flange with the spar. It came out pretty nice,



I then clecoed it back into place.

Next it took me some time to figure out where/how the w-423 joint plates come from. I finally noticed the note on drawing #12 section F-F. going into my inventory I found the 2 AS3 strips. I slowley worked it out that these do not need to be cut down. The are the correct length to begin with.
I then came up with the idea to fit then around the rib to double check the correct fit and also to pre-bend the strip. This turns out to be a fairly important step. I made sure to even out the slight overlap on each end and mark it.

 Then....I followed the plans to fit the joint plate in. The process for me was quire slow and lots and lots of adjustments back and forth to get just the right fit. I then started to match drill and cleco. Checking and re-checking as i went.


A long process...But extremely nice on how it turned out.