Thursday, December 3, 2015

Completed match drilling of the HS#2 - 3 hours

Now all that was needed was to match drill the HS skins. I had cleco'd every second hole, so I drilled each open hole. After I did a line of drilling, I checked then off with a sharpie as I went. From my previous empennage, I noticed that the odd time I would re-drill a hole that was already done and this increased the risk of making a hole oblong. So checking off a completed hole mitigated the risk.

At the end... Everything came out great.

Wednesday, December 2, 2015

Completed drilling the HS#2 front spar - 4 hours

Started off the evening by un-clecoing the skins on the left skin and marking out the holes for completing the cuts on the HS-702 spar. I then cleco'd the ribs and match drilled. I completed the cuts on the relief hole at the end of HS-702 and fitted everything back together on the skins. I prepped the new HS-00005 and set in on drilling the ribs to the front spar. Everything went extremely well, and I am very pleased with the workmanship. Finally!!!






































I un-cleco'd the skins and then began to drill all the remaining holes on the front spar outboard of the HS-00005/00006 ribs. I was sure to use my drill press and ensure that all holes were as straight as could be.








Tuesday, December 1, 2015

Resumed drilling the HS#2 - 1.5 hours

The news parts arrived from Van's and I wasted no time trying to get back to when I needed to be. I marked out the bend lines and trim lines on HS-710. This time around I was very careful to mark out the line that is 7/16" below the top edge. I then began to work on the new HS-702 spar. (Im still not a fan of bending out those tabs, never looks clean and nice as the rest of the pieces).

My friend mike came over to work on his HS for his Stewart S-51. We spent a couple of hours setting the hinge locations. Much more thought and planning involved with the S-51 than the Vans.


Sunday, November 29, 2015

Countersink Wing Spars - 3 hours

I had ordered the new parts (hs-00001, hs-00005, hs-710, hs-702) for the VS#2, so until they arrive I decided to move onto the wing spars. I've been doing lot's of reading on other blogs to ensure I have my steps down right.

First I set up the table by applying tape, to protect the spars from scratches. After clamping both spars to the table, I taped the gap between the spar flange and reinforcement spar to ensure I kept metal filings out. Then I began to match drill the #40 holes that hold the platenut rivets.


After the match drilling operations was complete (I checked holes off as I went). I then began to countersink. I tested and re tested the countersink on scrap and have it dialed in perfectly.

 As extra precaution, I have decided to prime the countersunk holes (The instructions mention to do this on the screw countersinks, but I will also do the platenut rivets as well. I used a q-tip and dipped it in primer)


Saturday, November 28, 2015

Nearly completed drilling the HS#2, Nearly... - 8 Hours



I tried to put in another stellar day in on the HS. Everything was going extremely well. I fitted the spars and ribs together. Worked on the HS-710/714 angles. Cleco'd on the skin. 

Began to fit the HS-00005/00006 ribs. Finished the left side and began the right. Then I noticed I made a terrible error. I drilled the hole fitting HS-00005 to HS-710 centered in the angle, not 7/16" down. The hole is too high up and edge distance is an issue. Silly mistake as I was going too fast. It only affects a few parts that I have to redo. Fortunately I didn't drill that hole on the right side, so i'm still ok. Normally I'd be quite ticked off.  

Friday, November 27, 2015

Completed riveting VS #2 - Started HS #2 - 7 hours



I riveted on the VS skin. It went extremely well. Using electrical tape to hold rivets while bucking works extremely well. The VS is ready for inspection. 

I then moved on to the HS. I drew out the HS layout in AutoCAD then printed it full scale, cut the template out and taped it to the part. The result was great. This saved me a considerable amount of time and the placement of lines and holes was surgical. Just like the lessons learned on the first HS. I tried to drill and match drill as much of the holes in the drill press. Results were impressive! 




Thursday, November 26, 2015

Began riveting VS#2 - 4 hours



I fitted/riveted the VS ribs and spars. Things started out well, except for when I tried to rivet the VS-202, VS-704, VS-705. This is a very difficult area to rivet without help. I tried to use a straight rivet set, which set the center rivet well, but its short so I could not reach the outer rivets. I tried to use double offset rivet set but the rivet wants to fold to the side. Had to drill them out a couple of times, at which point I gave up. I was fortunate to drill the shop heads off and punch the rivet shanks out which resulted in very clean holes still. I eventually bent the VS-705 up out of the way a bit, taped the short straight rivet set into the rivet gun, and set the rivets.
Note to self....Order a long straight rivet set. Would have saved much grief.
I then cleco'd the skin to the structure. Again...Like the first empennage, its very difficult to get the structure in place with minimal scraping to the skin. I did much better this time.