Saturday, December 13, 2014

HS Front Spar - 3 hours



Work has been quite crazy and not to mention I have also decided to put some time into skiing this winter, leaving little time for the RV build. Tonight I managed to get a little work done on the horizontal stabilizer. I dimpled all of the horizontal stabilizer parts (with the exception of the skins) and started to rivet. I have a tad bit of difficulty getting the pneumatic squeezer set up right. The trick is to set it so that it just under-squeezes the rivet and then it's an easy adjustment to get it dialed in. I think I may need to practice more and create a spread sheet showing the initial measurements for a given rivet size with a yoke/die combination.
The flush rivets were set without much trouble, however the first AN470AD4-7 rivet was squeezed too tight. I drilled the head of the rivet off and tried to pull the rivet out with pliers. Since the material was so thick, pulling out the rivet was impossible. I then had to drill the rivet out with a #30 bit, but resulting in an over sized hole. I need to use a larger -5 rivet. I completed the rest of the riveting with very good results. I only have one rivet that is set a bit close to the maximum (One rivet was not set to my liking, so I managed to do a good job drilling it out. Replaced with another AN470AD4-7 and bucked it...but did it a little too much. It's right on the line for spec)





Saturday, November 29, 2014

Priming - Round 2 - 6 hours



I really hate priming. I've tried to avoid it as best I could but I needed to get a bunch of parts primed today. It was the worst weather for it -32deg C. I heated up the garage and set up. Started in on washing, scrubbing, rinsing, cleaning, priming. It is a very nasty process as the pro-Form Degreaser and the MEK are pungent. The 2-part epoxy primer is downright nasty stuff.  It burns your eyes and even with the respirator on, it burns the lungs a bit. It has a tenancy to seep into the house as well. I can't wait till summer when I can do this outside.
I finished priming the HS parts and the rudder parts. I have most of the elevator stiffeners primed too  




Saturday, November 22, 2014

Elevator stiffeners and Elev. Trim Plate - 3 hours

I spent a bunch of time match drilling the elevator stiffeners to the skins. I also work away on the E-615PP trim access reinforcement plate. I dimpled the #6 screw holes, and then I set out to read up on what to do with the attachment holes for the corresponding K1100-06 nutplates. Obviously the rivets need to be the #426 flush type. I'm just not sure if I need to dimple or countersink. I see that a few folks have countersunk the reinforcement plate. Being that the material is 0.032" thick it is at the minimum recommended thickness for countersinking. I see that some people have opted for the oops rivet which keeps the smaller head but uses the larger #4 shank. I decided to countersink the reinforcement plate and then take it to my EAA meeting next week so I can have the guys take a look at it.

UPDATE - Well seems I made another mistake. I didn't quite understand that the oops rivet substitution that the Vans manual describes, and other folks have used is to replace the 426AD3-3.5 rivet that is called for with a NAS1097AD3-3.5 rivet.

I had it in my head to use an NAS1097AD4-X rivet which is wrong! I had countersunk this piece too deep. Now to start again!



Friday, November 21, 2014

Worked on Rudder strips and VS Spar - 4 hours



I put in a decent day on the plane. I made the R-918 attach strips. It took a bit of time to fit them. I was careful to check and recheck fit to ensure that I had proper edge distances. This is one part that could cause some issue with the forward end. After all was said and done, the attach strips turned out well.




I then worked on cleaning up the edges on the R-710 horn brace. I was please will all the edge distances as well. It paid off to heed other builders warnings to not cut too much off on this part.


I then worked on the new VS-803PP spar and VS-808PP doubler. 

Monday, November 17, 2014

Completed the Rudder Horn Brace - 2 hours



Nov 17, 2014 - 2 hours
Unfortunately my progress has been quite slow as I have been battling a bad cold. I did manage to do a little bit of work on the rudder. I cleco'd the skins to the rudder structure and proceeded to cut away the excess material on the horn brace. I've read many build logs where folks have trimmed too much so I was careful to not cut too much. I'd fit it, check, cut, then repeat until I was happy with the results. I rounded out the sharp corners with the 3m wheel.





Friday, November 14, 2014

Completed the VS - ready for pre-cover inspection - 4 hours

Riveting the spars and ribs together took a bit of thought. Some rivets you need to buck, some can be squeezed. I ended up drilling a couple of rivets out as I didn't set them enough, and when I went to give them a bit more, I gave them the smiley face on the head. I placed the rivets so that all shop heads are visible during the precover inspection.





 I then worked on cleco'ing the skin onto the structure then bucking rivets. I was surprised how well the rivets were to buck on the skin. It was much more easier than bucking the larger #4 rivets. I quickly was able to pick up the feel and sound of a properly bucked rivet. All in all the skin riveting went extremely well. I only had to drill out 5 or 6 rivets and re-do. The drilled out rivets came out so much easier than when working on the rear spars. I only had a two slight issues, only where trying to get rivets out holes where there was multiple pieces nested together. In one instance I had bent the very bottom rib flange tab while trying to take the rivet out. It took a bit of head scratching to figure out how to fix this. I thought about using a cherry max rivet, but then I decided to use my Dow Corning 3145 RTV to "glue" the slightly bent tab back into place. I then drilled the holes to #30 to accept an oops rivet.

I only have 4-3.5 oops rivets for now, I will order some longer ones and then buck the two needed rivets.




Thursday, November 13, 2014

Dimpled the VS skin - 1.5hrs



I spent the evening dimpling the Vertical stabilizer. Took a bit of time to set up in the basement so I didn't have to work in a cold garage. (It was -20deg C outside) and I didn't want to heat up the garage for just that.