Seeing how my rivet selection was limited, I ordered a few varieties
from Aircraft Spruce as well as the AN470AD5 rivets that I need to complete the
HS front spar. I decided to use scrap to dial in the pneumatic squeezer and
made short work of completing the outstanding rivets. I decided to replace one
of the AD4 rivets with an AD5 rivet that was opposite the needed AD5 rivet
purely for symmetry. Not needed, but it looks better.
Friday, December 19, 2014
Saturday, December 13, 2014
HS Front Spar - 3 hours
Work has been quite crazy and not to mention I have also
decided to put some time into skiing this winter, leaving little time for the
RV build. Tonight I managed to get a little work done on the horizontal
stabilizer. I dimpled all of the horizontal stabilizer parts (with the
exception of the skins) and started to rivet. I have a tad bit of difficulty
getting the pneumatic squeezer set up right. The trick is to set it so that it
just under-squeezes the rivet and then it's an easy adjustment to get it dialed
in. I think I may need to practice more and create a spread sheet showing the
initial measurements for a given rivet size with a yoke/die combination.
The flush rivets were set without much trouble, however the
first AN470AD4-7 rivet was squeezed too tight. I drilled the head of the rivet
off and tried to pull the rivet out with pliers. Since the material was so thick,
pulling out the rivet was impossible. I then had to drill the rivet out with a
#30 bit, but resulting in an over sized hole. I need to use a larger -5 rivet. I
completed the rest of the riveting with very good results. I only have one
rivet that is set a bit close to the maximum (One rivet was not set to my
liking, so I managed to do a good job drilling it out. Replaced with another AN470AD4-7
and bucked it...but did it a little too much. It's right on the line for spec)
Saturday, November 29, 2014
Priming - Round 2 - 6 hours
I really hate priming. I've tried to avoid it as best I
could but I needed to get a bunch of parts primed today. It was the worst
weather for it -32deg C. I heated up the garage and set up. Started in on
washing, scrubbing, rinsing, cleaning, priming. It is a very nasty process as
the pro-Form Degreaser and the MEK are pungent. The 2-part epoxy primer is
downright nasty stuff. It burns your
eyes and even with the respirator on, it burns the lungs a bit. It has a tenancy to seep into the house as well. I can't wait
till summer when I can do this outside.
I finished priming the HS parts and the rudder parts. I have
most of the elevator stiffeners primed too
Saturday, November 22, 2014
Elevator stiffeners and Elev. Trim Plate - 3 hours
I spent a bunch of time match drilling the elevator
stiffeners to the skins. I also work away on the E-615PP trim access
reinforcement plate. I dimpled the #6 screw holes, and then I set out to read
up on what to do with the attachment holes for the corresponding K1100-06
nutplates. Obviously the rivets need to be the #426 flush type. I'm just not
sure if I need to dimple or countersink. I see that a few folks have
countersunk the reinforcement plate. Being that the material is 0.032"
thick it is at the minimum recommended thickness for countersinking. I see that
some people have opted for the oops rivet which keeps the smaller head but uses
the larger #4 shank. I decided to countersink the reinforcement plate and then
take it to my EAA meeting next week so I can have the guys take a look at it.
UPDATE - Well seems I made another mistake. I didn't quite understand that the oops rivet substitution that the Vans manual describes, and other folks have used is to replace the 426AD3-3.5 rivet that is called for with a NAS1097AD3-3.5 rivet.
I had it in my head to use an NAS1097AD4-X rivet which is wrong! I had countersunk this piece too deep. Now to start again!
UPDATE - Well seems I made another mistake. I didn't quite understand that the oops rivet substitution that the Vans manual describes, and other folks have used is to replace the 426AD3-3.5 rivet that is called for with a NAS1097AD3-3.5 rivet.
I had it in my head to use an NAS1097AD4-X rivet which is wrong! I had countersunk this piece too deep. Now to start again!
Friday, November 21, 2014
Worked on Rudder strips and VS Spar - 4 hours
I put in a decent day on the plane. I made the R-918 attach
strips. It took a bit of time to fit them. I was careful to check and recheck
fit to ensure that I had proper edge distances. This is one part that could
cause some issue with the forward end. After all was said and done, the attach
strips turned out well.
I then worked on cleaning up the edges on the R-710 horn
brace. I was please will all the edge distances as well. It paid off to heed
other builders warnings to not cut too much off on this part.
I then worked on the new VS-803PP spar and VS-808PP doubler.
Monday, November 17, 2014
Completed the Rudder Horn Brace - 2 hours
Nov 17, 2014 - 2 hours
Unfortunately my progress has been quite slow as I have been
battling a bad cold. I did manage to do a little bit of work on the rudder. I cleco'd
the skins to the rudder structure and proceeded to cut away the excess material
on the horn brace. I've read many build logs where folks have trimmed too much
so I was careful to not cut too much. I'd fit it, check, cut, then repeat until
I was happy with the results. I rounded out the sharp corners with the 3m
wheel.
Subscribe to: